Under major developments in the field of business environment, the use of traditional budgets do not fit into these developments and adversely affect the future performance of the enterprises, which requires the transition to modern systems in the preparation of the budgets of activity based budgeting ABB because they provide a more accurate and objective estimates based on scientific foundations and practical avoided arising from the use of traditional budgeting problems, Where ABB is working better allocation of resources based on the activities of an enterprise and this positively affects the performance of the administration for the purpose of evaluating their performance according to responsibility centers and decision-making governance. The research concluded that the use of the activity-based budgeting ABB data service costs fairer base provides leading to convince top management of the Directorate of the importance and the role of the activity-based budgeting system ABB and provided them with the cost of data more accurate and appropriate help in planning, control and make the right decisions.
Activity-Based Budgeting, ABB, Activity Based Costing, ABC
Budgets play a crucial role in planning and control. They define the targeted plans and the necessary measures to achieve them. The budget is a quantitative expression of these plans and shows their financial or financial status or both. When used for planning, it is considered as a means to translate the objectives and strategies of the enterprise, and can also be used to use the budget in the control of those goals and strategies and control is the process of setting standards and compare the actual performance with the scheme and address the deviations between them (Mwakibasa, 2013).
Traditional budget approaches are insufficient to meet the demands of modern companies with multiple activities and large services they provide. They need advanced and sophisticated budget methodologies (ANULIKA, 2012). One of these modern approaches is the ABB, which is the fruit of the Activity-based costing ABC. Therefore, this system was addressed during the research because it is considered the basis in the budgeting process based on ABB activities.
The research consists of five parts, the first described ABB, the second part includes ABC because of its relationship with ABB and is a precedent for them. The third part concerned the research methodology and the fourth part for the practical application of ABB according to ABC, and the conclusion was fifth part discussed the most important conclusions of the research.
Activity-Based Budgeting ABB
The ABB concept was addressed in many ways, some of them described as a planning department and another seen as a tool to reduce costs and we will show that (Horngren et al., 2012) sees it as an entrance that focuses on the planned costs of activities necessary to produce and sell goods and services. explained that (Barfield et al., 2003) it is a planning approach that applies cost factors to estimate the levels and costs of activities necessary to provide a quantitative and qualitative balance of production.
Consider (Hansen et al., 2007) it an approach that emphasizes cost reduction by eliminating wasteful or wasteful activities and improving the efficiency of essential activities.
In a simplified way, the budget can be prepared based on activities in three steps according to what has been divided in the website that was relied upon as follows: (www.cgma.org) online
1. Determine the activities and their cost guides.
2. Estimate the number of units for cost directives.
3. Calculate the unit cost per activity.
There are two main benefits of ABB: (Huynh et al., 2013)
1. Identify situations when the production plan requires new energy, such as physical or human energies, to provide support and service activities in the organization.
2. Provides a more accurate method of estimating future costs.
It should be noted that there are several differences between the ABB system and the traditional budget, which he referred: (Sorinel et al., 2013) in table (1)
Table 1 Differences Between the ABB and the Traditional Budget |
|
---|---|
ABB | Traditional budget |
Focus on workload and operational costs | Focus on staff and departmental costs |
Identify unexploited capabilities | Measuring impacts but not identifying untapped capacities. |
Identify the necessary resources for the production plan. | Do not achieve the purpose in the general budget and only analysis and control |
Ensure performance to transform the Organization's thinking on fixed costs | Based on frequent negotiating processes between managers |
Focus on exploited and unexploited capabilities | Focus on fixed and variable costs |
An activity-based budgeting system can succeed only if the following main pillars are available (Shane, 2005):
1. Existence of Activity Based Costing: ABC.
2. Absolute support from senior management to prepare the budget system and the basis of activities and duly implemented.
3. The existence of an effective laminating system, following the actual implementation steps and limiting possible deviations as soon as possible so that management can find the necessary solutions to address them.
4. An effective system of human and material resources management is available.
5. The existence of an incentive system linked to the extent of commitment to the implementation and implementation of budget items prepared on the basis of activities to achieve the objectives set.
6. The existence of sub-departments capable of adopting positions that serve the public interest rather than personal and functional interests.
7. Adopting targeted individual initiatives, and holding meetings and discussions in order to benefit from the participation of all different administrative levels.
8. The presence of a cadre with sufficient knowledge of the system of budgets prepared on the basis of activities through the intensification of training courses and seminars in this area.
The implementation of the ABB system suffers from several difficulties summarized as follows: (Moustafa, 2005):
1. Resistance to changes by staff: When introducing a modern system in the preparation of budgets and work to change the traditional system here you find resistance to change by employees.
2. Lack of senior management support: We may also find boards with traditional thinking difficult to change, and therefore do not receive support for the modern system in the preparation of budgets ABB by the senior management of the facility for fear of increasing costs.
3. Lack of trained accountants: The modern approach to budgets (ABB) needs a number of trained accountants with high experience, and in the absence of trained accountants, it is difficult to apply the modern approach to the budgets and may lead to the wrong future targets, and thus increase costs.
4. Lack of experience and ability to use electronic devices: Lack of experienced staff in
5. The use of electronic devices prevents the application of the system (ABB) properly and feasible.
6. Difficulty in estimating costs: The inability to identify and estimate costs prevents the application of the modern approach to budgets and therefore must apply the ABC system through which the establishment can determine the costs accurately.
Activity-Based Costing Abc
He defined it (Maher, 1997) as the system that assigns costs first to activities and then to products or services based on the use of each product or service.
Considers it the best tool to revise the cost system, Customers on the basis that activities are required to produce both these products and services, since the philosophy of the system is based on the idea that activities consume resources, and that products consume activities (Horngren et al., 2012).
(Hilton, 2011) shows that it is a system that allocates indirect costs to the product or service using two steps and by focusing on activities where the indirect costs are allocated to the activities in the first step and then the costs of the activities are allocated to the product or service in the second step.
(Atkinson et al., 2012) is a system based on cost drives that link activities to products or services and distribute indirect costs to products or services.
Technical developments in the world during the 1980s have complicated production processes. To avoid making the wrong decisions regarding their outputs and to help them develop an appropriate price policy for their products or services to maximize their profitability. (Drury, 2006).
Relationship between ABC/B
The use of activity-based costing in the budgeting process enables managers to convert fixed costs into variable costs and to think about costs more objectively. Activity-based budgeting is part of the activity-based costing system (Haluk, 2010).
(Cooper & Kaplan, 1998) point out that ABC is not only an accounting method but also in all aspects of the business, where it helps management to know which products to produce and which customers serve? In addition to the role, this system plays in improving the company's future performance. “It is a strategic tool for the company to get more accurate cost and information on the profitability of its operations, products, services, and customers, which contributes to many important decisions, including pricing, marketing, product or service design, and resource recruitment decisions.” This makes ABC the cornerstone of ABB preparation. The next step of ABC is ABB. The Activity-Based Analyzes (ABA) system is the ABC system, which is based on tracking the actual activities and actual resources that have achieved the cost objective and procedures based on the distribution of direct and indirect costs to the product. The ABA system is based on a detailed analysis of the activities and functions as well as the resources consumed by the activities. Hence, both systems are the basis for building the ABB system, which builds on the information provided by the two systems to give accurate estimates of future activities and required resources.
However, ABC attributes resources to activities to determine the cost of products and services provided to customers. The activity-based budgeting approach begins with a prediction of the needs of products or services provided to clients that are used to plan activities for the duration of the budget and then identify the necessary resources for these activities (Hilton, 2011).
Application of the ABB system in the Directorate of Municipalities of Babylon
Babylon Municipalities Directorate is one of the formations of the Ministry of Municipalities and Public Works and consists of fifteen municipal institutions distributed in the districts and districts, and these municipalities practice a range of activities, which are of great importance in the well-being of the public life of the people of the province and the municipalities provide a wide range of services can be limited as follows:
1. Preserving the environment through cleaning the streets, landfill, filling swamps, lifting debris and distributing containers.
2. Establishing recreational and public projects such as gardens, parks and nurseries.
3. Distributing land to citizens and renting their own properties such as kiosks and shops.
4. Maintenance and maintenance of gardens, parks, streets, roads and bridges.
5. Identify and organize commercial advertisements.
6. Monitoring markets and issuing vacations.
To prepare ABB, it is necessary to provide the requirements for their application.
Table (2) show the five activities carried out by the municipal institutions were selected and linked to appropriate cost directives based on the cause and effect relationship between the activities and cost directives.
Table 2 Activities and Cost Drive |
|
---|---|
Activity | Number of specialized mechanisms |
Maintenance of specialized machines | Waste lift (ton) |
The environment | Number of pieces distributed |
Property | Tiled streets (km) |
Projects | Cleaned streets (km) |
Cleaning services | Number of specialized mechanisms |
Allocating and Distributing the Costs of Activities to Municipal Institutions
Maintenance Activity
Is one of the most important activities in the municipal institutions where the following tasks (maintenance of machinery and equipment and maintenance of roads and bridges and maintenance of gardens and parks and others).
The number of specialized mechanisms was select as a cost driver for this activity. The cost of this activity amounting to (1 010 347 654) was distributed. Note that the number of specialized mechanisms (318) is as follows:
Average cost per vehicle=(1 010 347 654) /318=3 177 194
From table (3) we note that Municipal Corporation 14 got the highest percentage of the distribution of maintenance costs while Municipal Corporation 12 got the second percentage of maintenance costs
Table 3 Distribution of Maintenance Activity Costs Among Municipal Institutions |
|||
---|---|---|---|
Institution | The average | Number of specialized mechanisms | Total amount (Iraqi Dinar) |
1 | 194 177 3 | 21 | 071 721 66 |
2 | 194 177 3 | 17 | 295 012 54 |
3 | 194 177 3 | 30 | 816 315 95 |
4 | 194 177 3 | 27 | 234 784 85 |
5 | 194 177 3 | 17 | 295 012 54 |
6 | 194 177 3 | 10 | 940 717 31 |
7 | 194 177 3 | 27 | 234 784 85 |
8 | 194 177 3 | 14 | 714 480 44 |
9 | 194 177 3 | 24 | 653 252 76 |
10 | 194 177 3 | 15 | 908 657 47 |
11 | 194 177 3 | 20 | 877 543 63 |
12 | 194 177 3 | 31 | 010 493 98 |
13 | 194 177 3 | 17 | 295 012 54 |
14 | 194 177 3 | 33 | 398 847 104 |
15 | 194 177 3 | 15 | 908 657 47 |
Total | 654 347 010 1 |
Environment Activity
It is one of the basic and important activities and at the heart of the work of municipal institutions as it performs the following tasks (sanitary landfill, lifting waste and debris, filling swamps, and distribution of containers)
The cost of this activity was distributed to the municipal establishments amounting to (425 000 000) Iraqi Dinars. The amount of waste collected is (269,616 tons) as follows:
Average cost per ton=(425 000 000)/(616 269) =1576 Iraqi dinars per ton
From table (4), we note that Municipal Corporation 14 received the first share of the costs of the waste submitted to the municipal institutions, followed by Municipal Corporation 2 and 4 respectively in the process of allocating and distributing the cost distribution.
Table 4 Distribution of Environmental Activity Costs Among Municipal Institutions |
|||
---|---|---|---|
Institution | The average | Quantity of Waste Lifted (Tons) | Total Cost (Iraqi Dinar) |
1 | 116 10 | 816 942 15 | |
2 | 900 15 | 400 058 25 | |
3 | 000 42 | 000 192 66 | |
4 | 000 36 | 000 736 56 | |
5 | 496 14 | 696 846 22 | |
6 | 400 2 | 400 782 3 | |
7 | 360 15 | 360 207 24 | |
8 | 700 8 | 200 711 13 | |
9 | 000 18 | 000 368 28 | |
10 | 808 2 | 408 425 4 | |
11 | 176 16 | 676 493 25 | |
12 | 600 33 | 600 953 52 | |
13 | 800 4 | 800 564 7 | |
14 | 380 46 | 880 094 73 | |
15 | 808 2 | 880 538 4 | |
Total | 000 000 425 |
Property Activity
Is one of the activities of municipal institutions, which performs the following tasks (distribution of land to citizens and rent and sell stalls and shops)
The number of pieces distributed to citizens was chosen as a cost guide for this activity. The cost of this activity was distributed to municipal institutions amounting to (1,200,000,000) Iraqi Dinars. The number of pieces distributed (3600) pieces, as follows:
Average cost per piece=(1 200 000 000)/(3600)=333 333 Iraqi Dinar per piece
We note that the municipal institution 11 got the highest percentage of the costs of this activity, followed by institutions 6 and 7 respectively in terms of their share of the costs of the activity mentioned.
Project Activity
Is one of the activities of municipal institutions that are interested in the following tasks (construction and paving of roads and bridges and the establishment of gardens, parks, nurseries, etc.)
Tiled streets have been approved as a cost driver for this activity, and the costs of this activity have been distributed to municipal institutions amounting to IQD 12,000,000,000. Note that the length of tiled streets reached (500 km), as follows:
Average cost per kilometer=12 000 000 000/ (500)=24 000 000 Iraqi dinars per kilometer.
Note from the table (5) that the municipal institution 12 most institutions percentage of costs due to a large number of projects for paving streets and followed by the institution 14.
Table 5 Distribution of Project Activity Costs Among Municipal Institutions |
|||
---|---|---|---|
Institution | The average | Length of Tiled Streets (km) | Total Cost (Iraqi Dinar) |
1 | 25 | 000 000 600 | |
2 | 36 | 000 000 864 | |
3 | 28 | 000 000 672 | |
4 | 22 | 000 000 528 | |
5 | 32 | 000 000 768 | |
6 | 17 | 000 000 408 | |
7 | 35 | 000 000 840 | |
8 | 42 | 000 000 008 1 | |
9 | 41 | 000 000 984 | |
10 | 35 | 000 000 840 | |
11 | 33 | 000 000 792 | |
12 | 46 | 000 000 104 1 | |
13 | 35 | 000 000 840 | |
14 | 45 | 000 000 080 1 | |
15 | 28 | 000 000 672 | |
Total cost | 000 000 000 12 |
Cleaning Activity
It is one of the important activities of the municipal institutions as it is the task of cleaning the streets, and the length of the cleaned streets was chosen as a cost driver for this activity, the cost this activity was distributed to municipal institutions amounting to (250,000,000) Iraqi dinars, note that the length of the cleaned streets (74330) km, As follows:
Average cost per kilometer=250 000 000/74 330=3363 Iraqi dinars per kilometer
From table (6) we note that municipal institution 4 got the highest rate of the cost compared to other institutions and the reason for this is that this institution has a high proportion of clean streets and previously planned, followed by the institution 14 in terms of the number of streets cleaned.
Table 6 Distribution of Cleaning Activity Costs Among Municipal Institutions |
|||
---|---|---|---|
Institution | The average | Length of clean streets (km) | Total Cost (Iraqi Dinar) |
1 | 3363 | 2880 | 440 685 9 |
2 | 3363 | 3000 | 000 089 10 |
3 | 3363 | 7600 | 800 558 25 |
4 | 3363 | 10800 | 400 320 36 |
5 | 3363 | 3000 | 000 081 10 |
6 | 3363 | 750 | 250 522 2 |
7 | 3363 | 3000 | 000 089 10 |
8 | 3363 | 7500 | 500 222 25 |
9 | 3363 | 3700 | 100 443 12 |
10 | 3363 | 2000 | 000 726 6 |
11 | 3363 | 6500 | 500 859 21 |
12 | 3363 | 6000 | 000 178 20 |
13 | 3363 | 5500 | 500 496 18 |
14 | 3363 | 8500 | 500 585 28 |
15 | 3363 | 3600 | 800 106 12 |
Total cost | 000 000 250 |
ABB of the Directorate of Babylon Municipalities:
We can see from table (7) that a parallel has been prepared for the municipal institutions based on their activities, as the previous tables were adopted to obtain the rates of loading, through this budget will provide institutions large sums that do not need.
Table 7 ABB Based on the Tables Above |
|||
---|---|---|---|
Service activities | Planned Projects | Planned indirect cost per unit | Total planned factory overhead |
Maintenance | 318 machine | 194 177 3 | 692 347 010 1 |
Environment activity | 500000 ton | 000 000 780 | |
Property activity | 4500 Plots | 333 333 | 500 998 499 1 |
Project activity | 750 Km | 000 000 24 | 000 000 800 10 |
Cleaning activity | 100000 Km | 3363 | 000 300 336 |
Total cost | 192 646 326 14 |
A range of conclusions can be presented as follows:
1. The application of (ABB) by the Directorate of Babylon Municipalities provides more accurate and objective information..
2. The Babylon Municipalities Directorate applies the traditional budgeting system in preparing the budget.
3. Lack of the requirements of the Babylon Municipalities to prepare the requirements (ABB) such as qualified human cadres and modern accounting systems.
4. Increasing the percentage of indirect costs from the total cost of the services of the Babylon Municipalities Directorate gives an incentive to implement ABB system.
5. Because of what ABB requires to have a cost-based activity system that contributes significantly to providing a database of service costs more equitably.
6. ABB is the result of ABC system.
Based on the conclusions, the most important recommendations can be summarized
1. The need to use scientific sources such as research, theses, theses or experts and accounting consulting firms to plan and assist in the application of ABB system.
2. the need to qualify the accounting staff in the Directorate and training him to process data and information electronically.
3. The need to hold training courses for the accounting staff in order to increase the efficiency and effectiveness of this staff in the field of preparation and implementation of ABB.
4. Convince the senior management of the Directorate of the importance and role of ABB system and the more accurate and appropriate cost data that it provides to them in the field of planning, control and decision making.
5. The need to understand and recognize the administrative levels of the advantages of modern systems (ABC and ABB) in turn in the redistribution of costs more accurately and in the process of proper planning.
6. For the purpose of the success of such modern systems it is necessary to combine efforts between all departments to overcome the difficulties that exist in the application process.